Design & Planning

Step 1:  Planning and Preparation

Step 1:  Planning and Preparation
  •   In Home Estimate
    • List of all the features you plan on having.
    • Vision you want to achieve.
    • How much should you invest on your basement?

Step 2:  Design

  •     Design project and design specifications for you to achieve a proper idea.
    • Design development, client is asked to review final details and specifications of the drawings.
      • Approval of a final design.

Step 3:  Contract

  •     Written detailed estimate that reflects the cost of your project.
  •     Scheduling starting date and duration of a project.
  •     Review designs and specifications.
  •     Review terms and conditions.
  •     Cost of project.
  •     Finalize financial agreement.
  •     Building permits etc.

Step 4:  Effective Communication

  •     Ongoing communication between client and construction team.
    • Keep the client up-to-date on new materials and work procedures available.
  •     Ask questions, be available, and stay in touch
  •     Stay current on payments  


Don't Base your design on the location of the Plumbing lines. KC Basement Finishing is licensed master plumber. We can move the lines for less. That's why were the best.


Finished Basement in Lenexa Ks
Construction

Step 2:  Mechanical


  • Demolition
  • Waterproofing
  • Framing
  • Electrical
  • Inspection of electrical
  • HV/AC
  • Rough in plumbing
  • Plumbing
  • Insulation
Finish Work

Step 3:  Carpentry & Final Touches

  • Drywall
  • Stairs and staircase opening
  • Flooring (if other than carpet)
  • Door installation
  • Bathroom fixtures are installed
  • Bathroom tiles are installed
  • Finish wood around windows
  • Bases, casing and crown moldings are installed
  • Bar is built and installed
  • Entertainment center is built and installed
  • Painting of trims and doors
  • Painting of walls
  • Door knobs and door stoppers are installed
  • New switches, receptacles, recessed light covers are hung to complete electrical
  • Vent registers are installed
  • Carpet is installed (if applicable)
  • Final Inspection